MobileFusion Trac20 Fusion Method Comparison
November 2004 Recent field testing of the MobileFusion Trac20 has yielded outstanding performance data when compared with conventional fusion welding methods:
| Side By Side Comparison of Fusion Methods
|
| Size |
Conventional Cost / Foot |
Fast Fusion Cost / Foot |
$ Savings |
% Savings |
| 2" |
$0.27 |
$0.22 |
$0.04 |
16% |
| 3" |
$0.32 |
$0.25 |
$0.07 |
23% |
| 4" |
$0.40 |
$0.26 |
$0.14 |
36% |
| 6" |
$0.50 |
$0.30 |
$0.20 |
41% |
| 8" |
$0.58 |
$0.35 |
$0.23 |
39% |
| 10" |
$0.75 |
$0.41 |
$0.34 |
45% |
| 12" |
$0.82 |
$0.50 |
$0.32 |
39% |
| 14" |
$1.06 |
$0.51 |
$0.54 |
51% |
| 16" |
$1.19 |
$0.58 |
$0.61 |
51% |
| 18" |
$1.19 |
$0.69 |
$0.50 |
42% |
| 20" |
$2.57 |
$1.12 |
$1.44 |
56% |
| |
|
Average Savings 40% |
| |
|
Average Savings 6"-20" - 46% |
MobileFusion Trac20 Preliminary Productivity Testing
April 2004 The data below is a summary based on initial productivity testing using an 8 hour work day and 50' sections of High Density Polyethylene (HDPE) pipe material.
Full data range on 3" through 20" SDR 7 and 11
4 inch HDPE Pipe (SDR 11) 6,500 to 7,000 feet
12 inch HDPE Pipe (SDR 11) 3,100 to 3,600 feet
18 inch HDPE Pipe (SDR 11) 2,100 to 2,600 feet
20 inch HDPE pipe (SDR 11) 1,300 to 1,600 feet
MobileFusion Trac 20 Overview
MobileFusion Trac 20 Features
Trac20's 3 Year Warranty
|
MFT in the field
Click for video
Contact FastFusion
MFT20 Quarter Front Click for full view
MFT20 Work Platform Click for full view
MFT20 Quarter Rear Click for full view
MFT20 Full Side Click for full view
MFT20 Fusion Inside Click for full view
|